Accreditation for CT, MRI, PET and nuclear medicine, and the FDA mammography certificate, are both tied to a site. What the rules say about notifying the accreditor, what they leave to the accreditor, and the questions to put in writing before closing.

← Back to Blog
3 min read · by White Glove Radiology
A framed accreditation certificate on the wall of an imaging center reception corridor with a CT suite door beyond.

Regulations require an accredited imaging supplier to notify its accreditor of modality changes and an IDTF to report an ownership change to Medicare within 30 days. Whether accreditation continues or restarts for a new owner depends on the accreditor's policy, so ask for its requirements in writing before closing.

Owners selling a center usually assume the accreditation goes with the keys. Sometimes it does. The regulations do not say so for you, and the accreditor's own rules decide.

Which duties does the rule set when ownership changes?

Two duties are certain. Under 42 CFR 414.68, an accredited supplier must notify its accreditation organization of modality changes. And an IDTF must report an ownership change to Medicare within 30 calendar days (410.33(g)(2)). Together they mean the accreditor and CMS both need to hear about the sale, and the dates should be in the closing checklist.

Does accreditation transfer to a new owner?

We do not state a rule, because we have not verified one for each accreditor. The designated organizations are the ACR, the IAC and The Joint Commission, and RadSite was designated in 2013; whether it still is should be confirmed. Each has its own policy on ownership changes, name changes and relocation. The sound approach is to ask the accreditor in writing, before the closing date, what the buyer must file and whether the cycle continues, restarts or needs a new application.

Which parts of the cycle stay the same either way?

  • The accreditation cycle. ACR accreditation lasts three years from the date the first module or unit passes, with random image checks and validation surveys during the cycle.
  • The equipment-specific requirements: a medical physicist's annual evaluation and phantom dosimetry for ACR sites.
  • Payment condition. Payment for the technical component of MRI, CT, nuclear medicine and PET under the fee schedule depends on being accredited, so a gap is a revenue issue on day one.

Where does the FDA mammography certificate stand?

The certificate is issued to a facility with its own FDA identification number and rests on accreditation. When a lapsed facility applies to be reinstated, 21 CFR 900.11(c) requires documentation of the previous owner or lessor and that ID number, which shows the agency tracks the facility's history across owners. As with the other accreditations, ask the accreditation body and the FDA what a change of ownership requires.

Questions to put to the accreditor

Write the questions down and send them by email so the answers exist in writing. A short list is enough.

  • Is the accreditation held by the site, the legal entity or both?
  • What must the buyer file after a change in ownership, and by when?
  • Does the three-year cycle continue on its existing dates, or does the buyer start a new application?
  • Will random image checks or validation surveys scheduled in the current cycle still apply?
  • Who is the correct contact for notices after the closing?

Keep the replies in the closing binder. If the answers differ from what the parties assumed, the purchase agreement may need a term about the cost and risk of a new application.

Timing the notices

The 30-day Medicare report runs from the ownership change, not from the day the accreditor replies. Send the accreditor your notice and questions as early as the deal allows, so its answer arrives before the closing date and not after the Medicare clock has started. If the answer is that the buyer needs a new application, learn that while there is still time to put a term in the agreement about who pays and who bears the risk of a gap in accreditation, a gap that affects payment for the technical component.

Keep the mammography side on its own track. The FDA certificate, the accreditation body for mammography and the accreditors of CT, MRI and PET are different relationships, and each deserves its own letter and its own reply on file.

Which documents go in the closing file?

A dated letter from each accreditor describing what it needs, the filings made, and proof of receipt. White Glove Radiology prepares the accreditation notices and the Medicare filing together in the Change of Ownership Packet ($1,995 per site, see pricing). The accreditor's own fees are paid to it directly, and we never accredit anything. See the Medicare steps for a sale for the rest.

Common questions

Does ACR accreditation transfer when I sell my center?
We do not claim a rule. Ask the accreditor in writing what a buyer must file and whether the cycle continues, before the closing date.
Do we have to notify the accreditor of changes?
42 CFR 414.68 requires an accredited supplier to notify its accreditation organization of modality changes, and ownership changes should be put to the accreditor as well.
Why does a gap in accreditation matter?
Payment for the technical component of MRI, CT, nuclear medicine and PET depends on accreditation by a CMS-designated organization.

Need Help with Licensing or Enrollment?

We prepare the application for your radiologist, owner or authorized official to sign, then track renewals, inspections and changes.

Get Started

The fastest way is to call. If you prefer, you can book online below.

817-518-1747
or

Book Online

Share your details and preferred availability.